Construction of Stadium With The Capacity of 33.000 Spectators in Diyarbakir

go back

Project Details

  • Name of Project
    Construction Of Stadium With The Capacity Of 33.000 Spectators In Diyarbakir
  • Place of Project
    Diyarbakır
  • Principal
    TOKI (Housing Development Administration (of Turkey))
  • Contractor Company
    Pilon Yapi Ins.Tic.Ltd.Sti-Yildizlar Ins.ve Tic.A.S. Joint Venture
  • Commencement and Completion Date
    2015 – Present

Project Features

The stadium with the spectator capacity of 33 thousand, the construction of which was commenced by the joint venture of Pilon Yapi Ins.Tur.Pet.Mad.Gıda Oto.Teks.Ith.Ihr.San.Ve Tic.Ltd.Sti.and Yildizlar Ins.ve Tic.A.S. in April 2015 in consideration of TRY 127,632.000, is built on the land of 240 decares. In the stadium, there are a protocol of 666 person, a VIP box of one thousand and 74 persons, a press box of 639 persons and 253 seats for disabled persons. Also, there are a car park of one thousand and 852 cars and a bus garage of 75 vehicles. The stadium, the construction of which continues rapidly, is planned to be completed to the extent to enable that football matches can be played in the second half of the season 2016 - 2017. In the project, the concrete of 100.000 m3 in different classes will be used, and the need for cement is about 40.000 tons.

Details of Cement Used in The Project

  • Total Amount of Cement
    40.000 tons
  • Cement Types
    CEM II/A-M (P-LL) 42,5 R